PERMANENT AWARD EVIDENCE

Vehicle Restraint Barriers C4-KCSL

Kilnbridge Construction Services Ltd · published 8 Jul 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDfb0c6354-21cb-43b1-9b38-994c6493fca6-853458
Open Contracting ID (OCID)ocds-b5fd17-2001e699-a56b-4f9d-b5be-bff74ef51055
Buyer identifierGB-CFS-288768
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£100,000
tender field
Procurement method
Not stated
Category
services
CPV
34928100
Crash barriers
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

The scope of the Subsubcontract works is the provision of all necessary People, Equipment, Plant, Materials, methodology, construction detailing, testing, assurance and handover for the Vehicle Restraint Barrer (VRB) along the Station Access Retaining Wall and within the Interfaces Susbstation Compound as described in this document, scope drawings and specifications. This will include all required temporary works, and their design, installation of, ongoing maintenance of and subsequent removal, required for the safe execution of the Subsubcontract works. The extent of the VRB within this scope of works is limited to the capping beam of the underlying retaining wall indicated in Fencing Drawings as N1 Vehicle Barrier, and the two runs of Vehicle Barrier (contained within DNO Substation Compound Works) to be carried out within the site, as depicted in Appendix 01. The Retaining Wall from Old Oak Common Lane is formed in the sum of three adjoining retaining structures (SSEN, Crossrail Depot, and Station Access Retaining Wall). Each listed below has specific drawings sets relevant to that length of wall. • Station Access Retaining Wall (SARW) • Cross Rail Depot Retaining Wall (CRL Depot) • SSEN Substation Retaining Wall More information to be provided..

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release8 Jul 2025
  2. 02Tender period endsTender-period field as published14 Jul 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 8 Jul 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗