Greek Street - Deck Construction Works

J Murphy & Sons Limited · published 7 Mar 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDf9866d25-f8cb-4163-a678-8598f9747225-832530
Open Contracting ID (OCID)ocds-b5fd17-3686037d-bce9-409d-af63-d0cd54eeba22
Buyer identifierGB-CFS-201385
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£1,000,000
tender field
Procurement method
Not stated
Category
works
CPV
45221112
Railway bridge construction work
Delivery
British Oversea Territories
No postcode
PUBLISHED DESCRIPTION

What the notice says

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release7 Mar 2025
  2. 02Tender period endsTender-period field as published14 Mar 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 7 Mar 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗