PERMANENT AWARD EVIDENCE

Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme

National Highways · published 24 Sept 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDef593689-2f57-46a2-acfe-e2179507ba85-865281
Open Contracting ID (OCID)ocds-b5fd17-856cc2af-b265-4ab7-8e33-c027b59f0e4a
Buyer identifierGB-CFS-323818
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£181,335
award field
Tender value
£181,335
tender field
Procurement method
Call-off from a framework agreement
Category
works
CPV
45233210
Surface work for highways
Delivery
North East, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment. The structure was commissioned in 1996 and has a design capacity of HA + 45HB. During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing. According to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise direction, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore, a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse. Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology and programme. The detailed design of the scheme has been completed by WSP

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release24 Sept 2025
  2. 02Tender period endsTender-period field as published15 Apr 2025
  3. 03Contract startsContract-period field as published12 Jun 2025
  4. 04Contract endsContract-period field as published6 Feb 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

SOURCE

Contracts Finder release

Published 24 Sept 2025 · held through the daily award projection · Open Government Licence v3.0.