WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV · published 10 Apr 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDe7f64e8b-2281-4640-aa83-3b5e885bae83-839873
Open Contracting ID (OCID)ocds-b5fd17-643c661c-fe88-4721-aa3f-db155eb6c6e6
Buyer identifierGB-CFS-130527
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£5,000,000
tender field
Procurement method
Not stated
Category
works
CPV
44212400
Piling
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

WP 15.04 IEP Access and Retaining wall Scope The scope consists of two key components: A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project. A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment. The following will be required: Detailed design, supply and installation of the above scope. Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels. Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction. Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements IEP Depot Access Route (Stage 2) - the ramp The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements. IEP Depot Retaining Wall Construction of a new bored piled retaining wall supporting the embankment to the south west corner of the IEP Depot. Piling, plunge columns, concrete planks, masonry finish, backfilling, RC concrete Could separate our piling/plunge columns from other works Piling could be incorporated into the highways scope Utility diversions to enable works above Several existing utilities running through the IEP Depot will need to be diverted or managed before major civils and excavation works can commence. These include: Foul sewer Multiple LV electricity supplies Telecoms

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release10 Apr 2025
  2. 02Tender period endsTender-period field as published25 Apr 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.