A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED · published 20 Feb 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDd01423b9-4a9c-4c91-805d-4e080514de72-885018
Open Contracting ID (OCID)ocds-b5fd17-e39f13c2-839c-4446-9628-de54c20a7117
Buyer identifierGB-SRS-supplierregistration.cabinetoffice.gov.uk/UfZq8heB
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£5,000
tender field
Procurement method
Competitive procedure with negotiation (above threshold)
Category
works
CPV
44212410
Sheet piling
Delivery
Not stated
CA10 1XQ
PUBLISHED DESCRIPTION

What the notice says

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release20 Feb 2026
  2. 02Tender period endsTender-period field as published6 Mar 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.