PERMANENT AWARD EVIDENCE

GMCA 824 Access Road

Greater Manchester Combined Authority · published 15 Sept 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDc4935228-9325-42a3-9735-cff15ab9cbe8-863527
Open Contracting ID (OCID)ocds-b5fd17-d14bc6c6-ff8a-43b6-9326-fe4aecafe3eb
Buyer identifierGB-CFS-94841
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£155,499
award field
Tender value
£200,000
tender field
Procurement method
Open procedure
Category
works
CPV
45000000
Construction work
Delivery
North East, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

Link to the Chest:https://www.the-chest.org.uk/\\r\r \\r\r The works are located, within land owned by Greater Manchester Combined Authority (GMCA). A 900mm culverted pipe is located beneath the existing Chichester Street Recycling Centre site at Rochdale. The culvert consists of two sections running from south to north conveying combined water flows from an upper catchment area in Rochdale and discharges to the River Roch. GMCA are currently working on a project to survey a section of the culvert, which would need arranging for a tanker to jet and cleanse a blocked section of the culvert, accessed from MH6. A new access road would be needed to allow the tanker to undertake the pipe maintenance. The scope of the project is as follows:\\r\r \\r\r Road Construction Works\\r\r \\r\r The scope of the works includes, but is not limited to:\\r\r \\r\r Setting up working areas\\r\r Demarcation of site boundary and provision of signage.\\r\r Traffic management of works in or affecting public highway/open areas/car parks.\\r\r Confirm line and level of existing surface water drainage system.\\r\r Survey existing manholes and propose means of connecting proposed road drainage system to existing surface water drainage system.\\r\r Undertake setting out procedures.\\r\r Carry out tree felling.\\r\r Site compaction trial.\\r\r Earthworks and grading to formation level.\\r\r Laying the geogrid combined separator as per the road detail.\\r\r Prepare subbase, base course, and surface layer.\\r\r Testing and quality control.\\r\r \\r\r Test and dispose of excavated material off site.\\r\r The Works are described in greater detail on the drawings.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release15 Sept 2025
  2. 02Tender period endsTender-period field as published23 Aug 2024
  3. 03Contract startsContract-period field as published10 Aug 2025
  4. 04Contract endsContract-period field as published22 Sept 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

Donellon Contractors Ltd

No legal entity is inferred from this supplier name.

SOURCE

Contracts Finder release

Published 15 Sept 2025 · held through the daily award projection · Open Government Licence v3.0.