PERMANENT AWARD EVIDENCE

EcoSF4: Judas Gap Fish Pass Detailed Design

Environment Agency · published 4 Mar 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDb4850bee-1c9d-4645-bb57-20e81c3c8090-887053
Open Contracting ID (OCID)ocds-b5fd17-b5873bc5-91cc-430a-b1b9-a3e994a319ae
Buyer identifierGB-CFS-331805
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£73,826
award field
Tender value
£73,826
tender field
Procurement method
Call-off from a framework agreement
Category
services
CPV
90700000
Environmental services
Delivery
Not stated
SW1P 3JR
PUBLISHED DESCRIPTION

What the notice says

Judas Gap is an Environment Agency owned structure located at the saline limit on the River Stour on the Essex Suffolk border, NGR TM0799732809. The site already has a pumped eel pass installed in the old fish pass chamber. The Judas Gap structure is critical in terms of fish movements for the Stour, for both freshwater fish that are trapped on the downstream side and migratory fish that require an entry/exit route to the freshwater system, both smelt and sea trout are present in the Stour estuary. The design will also need to ensure that eel passage is maintained. The River Stour has an augmented water supply from the Ely Ouse to Essex Transfer Scheme (EOETS), water is pumped from the Gt Ouse to the top of the rivers Stour and Pant. Located in the Lower Stour is one of the main water supply abstraction points at Cattawade Intake, Essex and Suffolk Water (ESW) abstraction licence number 8/36/15/*S/0123, NGR TM1004933059. Work has been undertaken in the latest round of the Water Industry Natural Environment Programme (WINEP) to ensure flow continues down the Lower Stour and North Channel during low flow conditions, rather than being abstracted from the middle reaches of the Stour, this has been implemented to prevent large scale fish mortalities and wider ecological harm in this section of the river, the EA has worked with ESW to secure 5mld for the operation of a fish passage solution in this section. The requirement to impound water in this section of the river for public water supply abstraction inhibits the possibility for barrier removal. This section of the River Stour is also a navigable waterway.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release4 Mar 2026
  2. 02Tender period endsTender-period field as published16 Feb 2026
  3. 03Contract startsContract-period field as published20 Feb 2026
  4. 04Contract endsContract-period field as published31 Jul 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

Jeremy Benn Associates Limited (t/a JBA Consulting)

No legal entity is inferred from this supplier name.

SOURCE

Contracts Finder release

Published 4 Mar 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗