PERMANENT AWARD EVIDENCE

WP4981 - Architectural & Fitout - T2 Space Optimisation - Landside

Costain Limited (H7-Heathrow) · published 15 Oct 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDb483d0fb-4a97-4adf-a94c-ae718721a68b-868218
Open Contracting ID (OCID)ocds-b5fd17-eb09cd78-d764-4f7c-a4c8-dc133ce94eef
Buyer identifierGB-CFS-271218
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£500,000
tender field
Procurement method
Not stated
Category
works
CPV
71240000
Architectural, engineering and planning services
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

Demolition The Subcontractor shall strip out and dispose of (unless noted otherwise) the following items, as indicated on the design drawings: • Partitions • Doors • Porcelain tiles • Ceiling baffles and supports (to be stored and reinstalled later) • Glazing • Builders work openings (including necessary modifications to wall framework) • Door penetrations • Column cladding • Screens, chairs, tablets, monitors & desks • Screed (including for cable routes in onward travel area). Regarding the above, consider the following: • The items marked within the "Excluded Scope" document are excluded from this scope and included in another package of works. • The Subcontractor shall ensure that existing fire compartments are not compromised by the works. The Subcontractor shall allow for any intrusive surveys to determine this requirement. Design This section should be read in conjunction with Section 5 (Design) of this document. The Subcontractor shall complete detailed design for the following elements: • Raised access floor • Temporary Works (Hoarding) • Ceilings • Partitions including modification to existing • Doors • Bulkheads • Glazing • Steelwork • Signage Installation The Subcontractor shall supply (unless noted otherwise) and install the following items as indicated on the design drawings and project specifications: • Screed • Hoarding (see section below) • Porcelain tiles • Floor access covers • Ceilings • Partitions including modification works and door infills • Wall finishes, skirtings and trims • Doors • Bulkheads • Glazing • Monolith Base plates (to be free issued to the subcontractor, example provided in the document pack) • Steelwork • Firestopping • Signage and wayfinding?

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release15 Oct 2025
  2. 02Tender period endsTender-period field as published21 Oct 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 15 Oct 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗