PERMANENT AWARD EVIDENCE

Conversion of Existing Storage Unit to Public Toilet Facility

Broseley Town Council · published 23 Feb 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDb3fdb424-29e2-4245-8457-356cec7dd040-885363
Open Contracting ID (OCID)ocds-b5fd17-727bceba-4eab-4e41-9d87-7dde9e0cd652
Buyer identifierGB-SRS-sid4gov.cabinetoffice.gov.uk/2D7h2Sb9
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£10,000
tender field
Procurement method
Competitive quotation (below threshold)
Category
works
CPV
45111240
Ground-drainage work
Delivery
Not stated
TF12 5AD
PUBLISHED DESCRIPTION

What the notice says

1. Introduction Broseley Town Council invites suitably qualified and experienced contractors to submit a tender for the conversion of an existing storage unit into upgraded toilet facilities within the cemetery grounds. The Council is content in principle to proceed with the works, subject to confirmation that all required elements are included within the quoted costs and that full compliance documentation is provided. ________________________________________ 2. Scope of Works The works shall include, but not be limited to, the following: A. External & Enabling Works 1. Traffic management arrangements. 2. Council fees for any required road closures. 3. Severn Trent connection fees (where applicable). 4. Road and ground reinstatement to existing conditions. B. Drainage & Groundworks 5. Installation of foul drainage pipe from the toilet block to the main sewer in the main road, including: o Excavation of trench o Supply and installation of gravel bedding o Pipework and fittings o Installation of manholes (as required) o Reinstatement to current ground conditions 6. Foul pipework from toilet and basin to external drainage system. C. Plumbing & Sanitary Installation 7. Supply and installation of toilet and hand basin. 8. Water connections to toilet and basin. 9. Plumbing in of water supply to the new toilet and sink. D. Internal Alterations • Alterations necessary to convert storage unit to compliant toilet facility. • Compliance with current Building Regulations and water authority requirements. • Provision of adequate ventilation and welfare compliance where applicable. ________________________________________ 3. Contractor Requirements The successful contractor must act as Principal Contractor and demonstrate compliance with the Construction (Design and Management) Regulations 2015 (CDM 2015). Tender submissions must include: A. Health & Safety Documentation • Confirmation of Principal Contractor compliance with CDM 2015 • Construction Phase Health & Safety Plan (CPP), outlining: o Site risk management o Welfare arrangements o Sequencing of works o Site control and public protection measures • RAMS (Risk Assessments and Method Statements) relevant to all aspects of the works. B. Insurance • Public Liability Insurance (minimum £5 million or as specified) • Employers' Liability Insurance • Professional Indemnity Insurance (if applicable) C. Accreditation & Certification • Relevant trade certifications • Operative tickets (e.g., CPCS/NPORS for plant, confined space where required) • Evidence of competency for drainage and water connections D. Programme of Works • Detailed programme/time plan outlining: o Proposed commencement date (from 1 April, subject to agreement) o Key milestones o Anticipated duration o Sequencing of works ________________________________________

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release23 Feb 2026
  2. 02Tender period endsTender-period field as published13 Mar 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 23 Feb 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗