Supply of Mechanical & Electrical (M&E) Equipment for the Water Management Zones (WMZ) at Sizewell C site

Sizewell C Limited · published 15 May 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release IDa4dbd6b9-ac2d-4330-a54b-463a9de5ae0f-845345
Open Contracting ID (OCID)ocds-b5fd17-1c5671d8-2cbd-4bd5-9144-78d9a3c03755
Buyer identifierGB-CFS-262881
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£1,000,000
tender field
Procurement method
Not stated
Category
goods
CPV
24962000
Water-treatment chemicals
Delivery
East of England, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

This expression of interest (EOI) serves to inform the supply chain about the upcoming procurement for the supply of Mechanical & Electrical (M&E) Equipment for the Water Management Zones (WMZ) at Sizewell C site. This equipment supply will be desilting type units to control the suspended solid discharge from the outfalls. These units shall be supplied with the pumps and ancillary equipment necessary to lift the water from the discharge network to the treatment plant and for integrating the pump with the control system. These treatment plants will be primarily used to treat surface runoff water collected via the site drainage network, but also includes emergency potable water discharges and some groundwater dewatering that cannot be practically treated at the main groundwater treatment plant. This table shows the space requirements, power requirements and source and flow rates for each WMZ treatment plant: WMZ / Treatment plant footprint / Treatment flow rate (l/s (m3/hr)) / Power requirement (kW) / Power source WMZ 1 12x6m 23.7 (85.3) 15-20 Generator WMZ 2 12x6m 27.6 (99.4) 15-20 Network WMZ 3 16x6m 40.7 (147) 35-40 Network WMZ 5 12x6m 31.2 (112) 20-25 Generator WMZ 7 25x7.5m 62.0 (223) 35-40 Generator TMO 25x25m 200 (720) TBC Generator The treatment plant is only required to manage total suspended solids (TSS); hydrocarbons are assumed to be trapped in the WMZ and will be removed using booms deployed by client. The concentrations for TSS are as follows: • Outfall to the SSSI 60mg/l • Outfall to the sea 250mg/l pH correction is not included at each WMZ but provision of it might be required on some plants.

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release15 May 2025
  2. 02Tender period endsTender-period field as published28 May 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.