PERMANENT AWARD EVIDENCE

GB-London: 1008157290 T1414 Testing the feasibility of the use of solar reflective solutions on rolling stock

Rail Safety Standards Board (RSSB) · published 17 Sept 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID94e0d07c-ba1a-4c70-bdd5-18b3b323a270-914448
Open Contracting ID (OCID)ocds-b5fd17-4dc899f9-9021-4afd-b823-87f0422d5b41
Buyer identifierGB-CFS-308663
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£119,710
award field
Tender value
£119,710
tender field
Procurement method
Not specified
Category
services
CPV
73110000
Research services
Delivery
British Oversea Territories
No postcode
PUBLISHED DESCRIPTION

What the notice says

T1414 aims to demonstrate the effective use of Solar Reflective Solutions to reduce internal vehicle temperatures, supporting improved passenger comfort, reduced HVAC energy consumption demand and improved component reliability for GB passenger rolling stock. Work Package 1- Benchmarking and trial planning • Assess the current performance of existing rolling stock paint systems to establish a baseline against which the potential benefit and disbenefits of adopting solar reflective alternatives can be determined. • Identify and select SRSs which meet GB passenger rolling stock requirements to ensure the SRSs trialled meet technical, safety, and operational material requirements. • Develop a test plan for a box trial, representative of a rail vehicle, to assess the effect that SRSs would have on internal rail vehicle temperature. Work Package 2 - Box trials • Undertake box trials2, representative of a rail vehicle, as per the test plan produced in WP1, to gather data on the solar, thermal and operational environment performance of SRSs. •Analyse the data gathered from the box trials to enable cost-benefit analysis of the material systems and mitigate potential risk/unsuitable candidates. Work Package 3 - Business case for SRS adoption • Produce an initial business case for the use of SRSs on GB passenger rolling stock based on WP2. Work Package 4 - Planning next steps - This will only be undertaken if business case in WP3 is positive • Identify the questions (including technical) that remain to be answered to make informed decisions on the adoption of SRS. • Develop a test plan for trial(s) that would answer the outstanding questions identified in WP 2 and 3 so RSSB may seek support from relevant parties and plan for such trial(s). Note - The decision to proceed with the last work package will be made by RSSB based on the findings from WP2 and 3. The work for WP4 should be included in the total price, but with the cost separately identified to be able to be removed if WP4 is not progressed.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

Source-date conflictAt least one reported end date precedes its corresponding start date. Check the official notice before using the schedule.
  1. 01Notice publishedPublication timestamp on the held release17 Sept 2026
  2. 02Tender period startsTender-period field as published30 Mar 2026
  3. 03Tender period endsTender-period field as published27 Feb 2026End precedes start · verify
  4. 04Contract startsContract-period field as published30 Mar 2026
  5. 05Contract endsContract-period field as published30 Apr 2027
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

Engineering Support Group Ltd

No legal entity is inferred from this supplier name.

SOURCE

Contracts Finder release

Published 17 Sept 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗