PERMANENT AWARD EVIDENCE

621621 - A194(M) SB & A184 Whitemare Pool Rbt Resurfacing

National Highways · published 11 Nov 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID8e730f35-eb15-4029-9d39-9ece0412e2f5-871645
Open Contracting ID (OCID)ocds-b5fd17-beb1c77d-df53-4261-b93d-ef2a30c1a382
Buyer identifierGB-CFS-323818
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£2,749,664
award field
Tender value
£2,749,664
tender field
Procurement method
Call-off from a framework agreement
Category
works
CPV
45233210
Surface work for highways
Delivery
North East, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

Background Information for the proposed Work Order The site is the A194(M) southbound carriageway between the A1(M)/A194(M) Jc 65 Birtley, and the A194(M)/A184T Whitemare Pool roundabout. The existing pavement surfacing consists of a mixture of a Thin Surface Course System (TSCS) between 7-10 years old, and an aged Hot Rolled Asphalt (HRA). The A194(M) mainline dual carriageway motorway is reaching the end of its serviceable life. Visible defects can be found whilst driving through the A194(M). Defects such as: longitudinal cracks, exposed longitudinal joint, edge cracks, transverse cracks, fretting, and some early developed potholes. Whitemare Pool circulatory carriageway is also included as part of the scheme due to road pavement degradation. The proposed work consists of resurfacing the A194(M) Southbound (SB) mainline carriageway, slip roads, designated lanes, and hard shoulder, as well as the A194 WMP Circulatory road pavement. Associated assets influenced by the works are to be re-established as per the existing layout. This includes road markings and studs, traffic and weather loops/sensors and bridge joints. There is also one traffic sign face to be renewed.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release11 Nov 2025
  2. 02Tender period endsTender-period field as published29 Jun 2025
  3. 03Contract startsContract-period field as published29 Jun 2025
  4. 04Contract endsContract-period field as published5 Dec 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

SOURCE

Contracts Finder release

Published 11 Nov 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗