PERMANENT AWARD EVIDENCE

Beckingham Camp_Electrical Intake Upgrades to support DNO upgrades

Ministry of Defence · published 19 Jun 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID88f31b88-1316-4f9b-ac3f-da4dbf6753e0-902885
Open Contracting ID (OCID)ocds-b5fd17-38666829-71eb-4940-bdac-8dd43be6ce1b
Buyer identifierGB-CFS-292426
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£312,000
tender field
Procurement method
Restricted procedure (above threshold)
Category
works
CPV
45310000
Electrical installation work
Delivery
East of England, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

The work to be delivered under this contract broadly comprises 2 elements: 1. Works that NGED require their customer to complete on their behalf, which is a stipulation of their quote, dated 14 August 2025 (Appendix 03 - Quotation). 2. Upgrade work required to be undertaken on the existing site electrical distribution infrastructure. 3. A general plan of the works (NGED drg 5645691) to be undertaken by NGED is included at Appendix A. This shows the main electrical components referred to in this scope, their locations, cable routes etc. It is included here for information only. Scope of Work Description The works required to facilitate uplift of the MIC comprise the following: 1. Undertake excavation / trenching (incl back-filling), to their specification, to allow NGED to install 7 X 600mm² AL solidal (LV) cables between the site boundary and the new site intake switchroom. 2. Design and construct a new site intake switchroom to include a new LV intake switchboard and requisite earthing. 3. Design and install inter-connecting LV cables between the new site intake switchroom and the existing (former) site intake switchroom (to provide a back-feed to the camp). 4. Provide builderswork in connection comprising: a. A new base for the new LV intake switchboard. b. A new GRP substation enclosure. c. New lighting, small power and background heating for the substation. d. Excavation / trenching (incl back-filling) for the new inter-connecting LV cables. 5. New handover information and documentation. 6. Provide temporary power for the Camp during the shutdowns.

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release19 Jun 2026
  2. 02Tender period endsTender-period field as published1 Jul 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 19 Jun 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗