PERMANENT AWARD EVIDENCE

Purchase new Toro

Saffron Walden Town Council · published 14 Jan 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID772ecf1a-8f5f-4af3-adf3-21044528c022-816859
Open Contracting ID (OCID)ocds-b5fd17-67afea43-74d3-4fb8-b28f-82d9aa23e6d1
Buyer identifierGB-SRS-sid4gov.cabinetoffice.gov.uk/dpK83tKB
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£50,928
award field
Tender value
£40,000
tender field
Procurement method
Open procedure (above threshold)
Category
goods
CPV
16311100
Lawn, park or sports-ground mowers
Delivery
Not stated
CB10 1HR
PUBLISHED DESCRIPTION

What the notice says

1 x Toro LTF3000 Stage 5 4WD KEY SPECIFICATIONS: • Fuel Capacity: 60 litres - provides a full day of operation • Transport Speed: Forward: 0 to 15.5 mph / Reverse: 0 to 7 mph • Cutting Width: 76 cm up to 212 cm • Blade Type: Three independent hydraulically driven 27.5 cm diameter, 76 cm wide fine cut flail cutting units • Ground Speed: Forward: 0 to 15.5 mph / Reverse: 0 to 7 mph • Height of Cut: infinitely variable between 20 to 75 mm • ROPS: Two post folding ROPS frame • Weight: 1,392 kg (with ROPS), 1,592 kg (with cab) with full tank of fuel KEY MODEL FEATURES: • Heavy Duty: Adopting a proven platform, featuring heavy duty rear axle, chassis and lift arms Powerful 33kW (44.2hp) Turbo diesel engine 4WD On Demand transmission Efficient hydraulic systems for maximum power • Outstanding Service Access: The LT-F3000 is easy to maintain, service and clean. This helps to reduce downtime, labour and maintenance costs. Easy to access key components Reduced maintenance costs due to robustness and durability of flail units' design

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release14 Jan 2025
  2. 02Tender period endsTender-period field as published25 Sept 2023
  3. 03Contract startsContract-period field as published25 Sept 2023
  4. 04Contract endsContract-period field as published29 Sept 2023
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

SOURCE

Contracts Finder release

Published 14 Jan 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗