ISO 11 Incinerator Life Extension Project - WP6 Diesel Tank Replacement

THE PIRBRIGHT INSTITUTE · published 20 Feb 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID70da708f-02cc-430f-b1b0-3c07baeeb378-818709
Open Contracting ID (OCID)ocds-b5fd17-f386270d-e687-4a48-9680-21abd7d2dbb2
Buyer identifierGB-SRS-sid4gov.cabinetoffice.gov.uk/fBcZ6sBB
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£51,081
award field
Tender value
£30,000
tender field
Procurement method
Open procedure (below threshold)
Category
works
CPV
44611400
Storage tanks
Delivery
Not stated
GU24 0NF
PUBLISHED DESCRIPTION

What the notice says

The contract is for a single supplier to provide Design and Build of Work Package 6 - Diesel fuel system upgrade and fuel tank replacement, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the Diesel Fuel System to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years. The scope of works will involve: • Detailed design work for the new diesel tank system, with all calculations (tank sizing, pump sizing, pipe pressure loss, etc) • Supply, manufacture, delivery and installation of the new diesel tank system • Offline commissioning of the new diesel tank system o It is a requirement that prior to connecting to existing pipework, the new diesel tank system proves that there is the required pressure up to the point of connection. • During the scheduled shutdown, the new diesel tank system is connected to existing pipework. • Final commissioning with the burners in operation. • On completion of commissioning, dismantle, remove and dispose of the existing diesel tank, all ancillaries and any redundant diesel fuel pipework. • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all valves/components labelled with a schedule of components included. A separate section which provides details of the following o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome. • As part of the works, the supplier should also provide the following: o Provision to ensure safe access and egress to any confined spaces (Gas monitors, Rescue Personnel, Outside Watchman, etc). This may not be applicable but needs to be considered. o All provisions for the installation and deconstruction work, including but not limited to:  All necessary machinery and equipment required for the works.  Provision of lighting if needed during winter months  Provision of transport vehicles required for the works which is not listed as part of the CDM site below.  Provision of weather protection for any equipment and materials used/stored outside.  All PPE required for safe working during all works. Additional information: Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to Procurement.Department@pirbright.ac.uk asap. Then and only then will access to the full ITT package (6. Appendix E1 - Site Documents, 6. Appendix E2 - Fuel Sample report and 6. Appendix E3 - Existing Diesel Fuel System Schematic and 6. Appendix E4 - Diesel Tank System Location Map) be granted to the requester.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release20 Feb 2025
  2. 02Tender period endsTender-period field as published1 Nov 2024
  3. 03Contract startsContract-period field as published20 Jan 2025
  4. 04Contract endsContract-period field as published28 Nov 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

SOURCE

Contracts Finder release

Published 20 Feb 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗