PUBLISHED COMMERCIAL FIELDSValues stay separate.
A tender estimate and an award value answer different questions. Neither is treated as cash paid.
- Award value
- Not disclosed
award field- Tender value
- £1
tender field- Procurement method
- Open procedure (below threshold)
- Category
- works
- CPV
- 34000000
Transport equipment and auxiliary products to transportation- Delivery
- England, United Kingdom
No postcode
PUBLISHED DESCRIPTION
What the notice says
Cambridge City Council (CCC) is enhancing the public cycle parking at the Queen Anne Terrace (QAT) multi-story car park on Gonville Place in central Cambridge. The cycle parking at QAT addresses a strong local need due to its proximity to key facilities, including businesses, leisure and shopping areas, hospitality venues, green open spaces, and other amenities. Recreational and sports facilities are also available on site. The proposed improvements include additional cycle parking spaces and enhancements to safety, security, and accessibility. There are two cycle parking areas at QAT: one inside the car park building and the other outside, which is not covered. Both are at street level. There is a demand for safe, secure, and accessible short-term and long-term cycle parking. In the undercover cycle parking area, CCC plans to remove all existing cycle stands and ground anchors, adjust fence lines, and screed the floor before installing new cycle stands in a 'toast-rack' setup (consisting of two or more cycle stands securely attached to horizontal steel sections), cargo cycle parking bays with new ground anchors, and signage. An access-controlled area is also proposed, which will require a swing gate fitted with mag locks. For the external cycle parking area, CCC proposes to remove all existing vegetation, including a semi-mature tree, and all existing cycle stands and concrete hardstanding. The area will then be excavated to install an engineered tree pit with a hardstanding area above, and new root-fixed cycle stands (each stand leg embedded into a concrete foundation). New trees will be planted after the works are complete.
Tender statusactive