PERMANENT AWARD EVIDENCE

Boiler Replacement, Old Priory, Leominster

Leominster Town Council · published 27 Jan 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID62e5d088-f43f-4f4e-bc3e-dd247a2af0e2-820675
Open Contracting ID (OCID)ocds-b5fd17-76c516b6-58da-4b03-af1b-702c43e8c3db
Buyer identifierGB-SRS-supplierregistration.cabinetoffice.gov.uk/Uj72rzYV
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£73,935
award field
Tender value
£70,000
tender field
Procurement method
Open procedure (below threshold)
Category
works
CPV
42160000
Boiler installations
Delivery
Not stated
HR6 8EQ
PUBLISHED DESCRIPTION

What the notice says

Leominster Town Council wishes to procure an appropriately qualified and accredited plumbing and heating engineer to replace existing plant room boilers, associated ancillary equipment, accompanying pipe work, and controls at the Old Priory site. Specifically, this work will include: - Isolating gas and electric supplies, taking them back to localised isolation points and testing for soundness. - Fully draining the existing heating system. - Removal of all redundant equipment, boilers, flues, pipework, pumps etc. - Installation of 2 x 70kw gas condensing boilers, with flues and air ducts according to the manufacturer's specifications. - Provision of new pumped primary boiler circuit (from boiler shunt pumps to the plate heat exchanger) - Provision of new secondary distribution circuits within the plant room. - Provision of one new automatic system pressurization unit (one to be retained) - Installation of new BMS controls for the boilers and heating system, including zoning and thermostatic time controls. - Installation of new electrical control panel. - Flushing and recharging the heating system, including corrosion inhibitor. - Commissioning of new boilers and instructing staff on use of controls. - 2 years of servicing and system support - 5 year minimum guarantee (to cover boiler hardware and software) The - boilers MUST be commissioned by the manufacturer to obtain this warranty. Works must: - Include appropriate lighting, signing and guarding to protect members of the public for the duration of the works. - Include issuing of all industry standard certificates for the works - Comply with all Scheduled Monument Consent requirements communicated by the client - Leave the site clean, tidy and ready for use. Tenderers are: - required to inspect and examine the site and its surroundings before submitting their tenders - advised to obtain all necessary information which they feel is necessary to submit their tender. It will be a condition of the invitation to tender that the tenderer should not at any time prior to notification of the award of the contract disclose to or otherwise discuss with any other tenderer or any other third party its actual or intended tender price or any approximation of that price. Your indication that you wish to submit a tender will be taken as acceptance of that condition. The client offers no guarantee that the lowest or any tender will be recommended for acceptance or accepted. The client will not be responsible for any cost incurred in the preparation of any tender. All tenderers are to complete sections 4-12 of the supplied RFT form, along with a tender summary spreadsheet, and return their submission by Sunday 15th December 2024 at midnight to: boilerprocurement@leominstertowncouncil.gov.uk Contract queries must be submitted by email to Liz Womack at e.womack@leominstertowncouncil.gov.uk in advance of 5pm Monday 9th December 2024.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release27 Jan 2025
  2. 02Tender period endsTender-period field as published15 Dec 2024
  3. 03Contract startsContract-period field as published13 Jan 2025
  4. 04Contract endsContract-period field as published1 Mar 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

SOURCE

Contracts Finder release

Published 27 Jan 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗