S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews

National Highways Limited · published 3 Jul 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID5749e1a2-e8e5-4723-952e-2e2b02c447dd-904624
Open Contracting ID (OCID)ocds-b5fd17-991251a4-d597-4d92-b151-70771e9861fa
Buyer identifierGB-CFS-328360
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£272,959
award field
Tender value
£330,000
tender field
Procurement method
Call-off from a framework agreement
Category
services
CPV
73220000
Development consultancy services
Delivery
British Oversea Territories
No postcode
PUBLISHED DESCRIPTION

What the notice says

Barton High Level Bridge (BHLB) is an eighteen-span steel-concrete composite structure carrying the M60 over the Manchester Ship Canal. The original bridge, constructed in 1960, comprised two independent deck halves formed from four longitudinal composite girders each, separated by a central reserve joint and supported by reinforced concrete bank seat abutments and hollow-column piers. The bridge was later widened between 1986 and 1989 as part of the M63 improvement works, with new edge girders and an extended deck slab added on both sides. Pre-widening investigations identified slight alkali-aggregate reactivity (AAR) in the original concrete, prompting a change in design approach. Instead of creating monolithic widened piers, the new outer supports were redesigned as independent, free-standing hollow reinforced-concrete columns founded on separate piles and connected to the original piers via link-and-pin "Pin Bearings". This configuration allowed independent vertical behaviour while constraining lateral and longitudinal movement, with the understanding that long-term monitoring and periodic bearing adjustments would be required to manage differential movements.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release3 Jul 2026
  2. 02Tender period endsTender-period field as published8 Apr 2026
  3. 03Contract startsContract-period field as published1 Jul 2026
  4. 04Contract endsContract-period field as published31 Mar 2029
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

AtkinsRéalis Jacobs Joint Venture

No legal entity is inferred from this supplier name.

SOURCE

Contracts Finder release

Published 3 Jul 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗