PERMANENT AWARD EVIDENCE

Rushmire Hill Geotechnical Remediation and Standish Multi-User Path

Gloucestershire County Council · published 14 Feb 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID505d28bf-bc67-4b06-b1dc-16ab49fcaf9f-826400
Open Contracting ID (OCID)ocds-b5fd17-3d624723-6298-4f36-905f-61f8547a6226
Buyer identifierGB-CFS-138752
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£1,741,800
award field
Tender value
Not disclosed
tender field
Procurement method
Open procedure
Category
works
CPV
45000000
Construction work
Delivery
England, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

This advert is intended to notify potential suppliers of the combined tender including both the Rushmire Hill Geotechnical remediation and the Standish Multi-User Path works. These two pieces of work have been packaged as a single tender.\r \r Rushmire Hill Geotechnical Remediation\r Rushmire Hill is in South Gloucestershire, near Wotton-under-Edge, approximately 1.2 km south of Cotswold Edge Golf Course. The works are required to stabilise the B4058 carriageway, which has historically suffered deterioration from ground movement. Remediation works will include sheet piling along the GCC owned verge, verge and carriageway reconstruction. Site clearance will also be required to facilitate the piling works. \r \r Summary of Construction Phase key deliverables are as follows:\r Site clearance including tree clearance over approx. 255m, 3.5m width.\r Sheet piling installation along an approx. 255m length of verge.\r Partial carriageway reconstruction of the northbound carriageway over 280m. \r Carriageway resurfacing over approx. 300m\r Ground investigation including the installation of 3 no. inclinometers and 1 no. slotted standpipe in the carriageway\r Traffic Management during the construction works.\r Maintain residents' access during the construction works.\r \r Standish Multi User Path\r The works are located between the Horsemarling Lane roundabout and Blackbridge access track to the south of Standish, Gloucestershire. This scheme is part of a wider strategic scheme to boost active travel provision within the county, through the creation of the Gloucestershire Cycle Spine and includes a section of bridle way. \r \r Summary of Construction Phase key deliverables are as follows:\r Construction of 400m of 3m wide new shared use path and bridal way\r 150m of carriageway realignment and works to splinter island\r Streetlighting column installation and relocation. Columns will be supplied by GCC.\r Utility diversion works (pre-arranged by GCC for Principal Contractor to liaise/accommodate).\r Drainage works that tie-in to existing systems and includes ditch and attenuation pond construction.\r Traffic Management during the construction works.\r Maintain residents' access during the construction works\r \r Gloucestershire County Council are seeking a Principal Contractor to deliver the construction phase of this project.\r \r A summary of the outline programme for the combined packages of works is shown below:\r Tender period: 26th Sep - 31st Oct 2024\r Award: Monday 25th November 2024\r Anticipated Works Start Date: Monday 6th January 2025\r Completion: Friday 30th May 2025 \r Overall Duration: 22 weeks\r Indicative Value: (£2.2M + £0.44M VAT) = £2.64M\r \r The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.\r \r Full details will be available in the tender pack advertised on Procontract Thursday 26th September 2024.\r \r https://procontract.due-north.com/Advert?advertId=e79b7d6e-ad6f-ef11-812f-005056b64\r

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release14 Feb 2025
  2. 02Tender period endsTender-period field as published31 Oct 2024
  3. 03Contract startsContract-period field as published6 Jan 2025
  4. 04Contract endsContract-period field as published30 May 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

Montel Civil Engineering Ltd

No legal entity is inferred from this supplier name.

SOURCE

Contracts Finder release

Published 14 Feb 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗