PERMANENT AWARD EVIDENCE

Prior Information Notice - Project Wren

GOVERNMENT PROPERTY AGENCY · published 17 Jun 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID4794a783-bc1c-4315-8a44-cdf7ebc92983-850123
Open Contracting ID (OCID)ocds-b5fd17-710245be-da04-42a6-9795-5e43dd5a11b4
Buyer identifierGB-SRS-supplierregistration.cabinetoffice.gov.uk/33rD6A8J
Release typeplanning
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
Not disclosed
tender field
Procurement method
Not stated
Category
Not stated
CPV
09323000
District heating
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

Prior Information Notice (PIN) The purpose of this PIN is to maximise transparency and competition for the upcoming tender being carried out via the Crown Commercial Services RM6313 Demand Management & Renewables Dynamic Purchasing (DPS) System. https://www.crowncommercial.gov.uk/agreements/RM6313 All details in this PIN are subject to updates or change. It is not a formal invitation to tender. Procurement / Project Information Project Wren Scope: The Whitehall District Heating System (WDHS) is currently powered by 4 large boilers and supplies heat to 17 Buildings across Whitehall in London. Project WREN (Whitehall Renewable Energy Network), aims to provide enabling works to potentially decarbonise the WDHS in future years to come. Project WREN will reduce the operating temperature from 145 degrees to 95 degrees and introduce a variable flow rate across the system; to achieve this the project will need to replace 49 Plate Heat Exchangers across 24 plant rooms in 11 buildings, as well as carrying out some modifications to the primary side pumps within the main boiler house. The new PHE's must be capable to withstand a potential second drop in operating temperature in the future to 65 degrees. Not all plantrooms are the same and therefore all designs will need to be tailored to each specific plantroom. The contract will be a design and build contract, the contractor will be given a RIBA 3 developed design which they will progress to a RIBA 4 and issue 'Drawings for construction' for approval with the GPA. Notwithstanding any approval from the GPA the contractor will maintain design liability for the project. The Contractor will need to complete the onsite works within 2 summer shut down periods between 01 May 2026 to 30 September 2026 and 01 May 2027 to 30 May 2027, when the district heating system is not in operation. Due to the location and security level of the project all personnel working on the project must hold a minimum of SC clearance. Dynamic Purchasing System (DPS) It is intended that the tender will be held via Crown Commercial Services RM6313 Demand Management & Renewables DPS. To participate in the tender, you will need to be a registered RM6313 supplier. DPS registration details are here: https://www.crowncommercial.gov.uk/information-for-buyers-and-suppliers/start-supplying/become-a-supplier-on-a-dynamic-purchasing-system-dps Market Engagement (ME) An initial market engagement session is scheduled on 30/06/2025 at 10 - 11am via Googlemeet. A questionnaire will be issued to all interested parties, with the aim of helping GPA understand the market and refine the project deliverables. To attend the market engagement meeting and receive a copy of the questionnaire, Please email netzeroprocurement@gpa.gov.uk

Tender statusplanning
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release17 Jun 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 17 Jun 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗