PERMANENT AWARD EVIDENCE

Fit Out - WP12.5 Architectural Metalwork - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV · published 1 May 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID46cc8f56-d024-4d91-9f80-01132ad716e2-843197
Open Contracting ID (OCID)ocds-b5fd17-5fd91183-4ec6-4fd6-b9f4-85cb2cfbaeff
Buyer identifierGB-CFS-130527
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£10,000,000
tender field
Procurement method
Not stated
Category
works
CPV
45262420
Structural steel erection work for structures
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

WP12.5 Architectural Metalwork Scope of work: OOC HS2 Station Architectural Metalwork Package (WP12.5) consists of the design for construction and manufacture, supply, installation and assurance of architectural metalwork to the front of house HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following key elements: • Steel and glazed balustrades, with integrated lighting. • Timber handrails, with integrated lighting. • Platform barriers. • Lighting columns and armatures. Key deliverables will be: • Design Development: Prepare the design for construction and manufacture of architectural metalwork, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements and ancillary elements to meet the prescribed performance requirements. • Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards. • Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for the installation of architectural metalwork in accordance with the approved design. • Assurance and Certification: Generate and supply comprehensive assurance documentation for architectural metalwork installations, including testing as required. • Coordination: Ensure coordination of architectural metalwork installations with various substrates, and other finishes to achieve integration within the overall project. By executing the works diligently and adhering to the prescribed specifications, our aim is to deliver a high-quality architectural metalwork package that meets the requirements and contributes to the success of the Old Oak Common HS2 Station project. About the buyer's selection process: Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system. The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course. What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment). About the buyer: In 2018, Balfour Beatty, VINCI and SYSTRA (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common. BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety. Additional information: No Documentation is included at this point.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release1 May 2025
  2. 02Tender period endsTender-period field as published30 Aug 2023
  3. 03Contract startsContract-period field as published26 May 2025
  4. 04Contract endsContract-period field as published31 Jul 2029
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 1 May 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗