WP15 Final Highways Scope - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV · published 21 Aug 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID44b34daa-4df3-432a-8263-cf7c34fde72a-860311
Open Contracting ID (OCID)ocds-b5fd17-b9e74b50-fd16-4bb2-9e8b-7bc6a60c5dbb
Buyer identifierGB-CFS-130527
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£20,000,000
tender field
Procurement method
Not stated
Category
works
CPV
44212400
Piling
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

WP15 Final highways scope The OOC Lane realignment & Final highways scope package consists of: Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?) Installation of any temporary critical highway furniture (e.g. Street Lighting, Barriers) required to carry out the works Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence. The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing All temporary works required for the construction of the works, including any access requirements Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements Removal and disposal of all current utilities in the highway. Installation of OOC Lane footpath retention structures Installation of any other required Highway Civils Installation of all highway and foul drainage Installation of UKPN 132kV & 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works The removal of any installed temporary works and the construction of the highway The installation of all highway furniture and its required infrastructure (traffic lights incl of ducting, islands, street lighting incl of ducting etc) Removal of temporary works installed by others to facilitate utility connections at the north and south end of the

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release21 Aug 2025
  2. 02Tender period endsTender-period field as published29 Aug 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.