PERMANENT AWARD EVIDENCE

Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park - AWARD

Lee Valley Regional Park Authority · published 18 Mar 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID3c5ff4b5-e2c4-4032-8353-18991b34c8e2-834294
Open Contracting ID (OCID)ocds-b5fd17-97832817-47db-4b5f-af25-594d6caed581
Buyer identifierGB-CFS-109712
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
Not disclosed
tender field
Procurement method
Open procedure
Category
works
CPV
45233253
Surface work for footpaths
Delivery
Not stated
EN2 9HG
PUBLISHED DESCRIPTION

What the notice says

The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey & Tennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded 'Gold Top' surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below. This project is for the phased replacement of the Gold Top areas on a priority basis. It is envisaged that the Authority will split the 36,000m2 into approx. 4500m2/annum over an 8 phase period (one phase per financial year). The contractor will be required to remeasure areas on completion and works will be paid on a square metre basis. The first phase of works will be scheduled to take place in March/April 2025 due to financial reasons but generally it is envisaged that the following phases will be carried out in May/June each year with the second phase being a 'follow on' to phase 1 in 2025. The contractor should price for each phase separately and in doing so allow a nominal uplift for inflation and material price increases.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release18 Mar 2025
  2. 02Tender period endsTender-period field as published4 Feb 2025
  3. 03Contract startsContract-period field as published23 Mar 2025
  4. 04Contract endsContract-period field as published30 Jun 2031
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

Henderson & Taylor (Public Works) Limited

No legal entity is inferred from this supplier name.