Westbrook Weir Modelling and Outline Design

Environment Agency · published 6 Oct 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID3b38e84b-a298-417e-88ee-33a5a62ef3b9-866989
Open Contracting ID (OCID)ocds-b5fd17-21f10dcc-277e-4012-91bc-2fa8fb0af6e3
Buyer identifierGB-CFS-274201
Release typeaward
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
£81,663
award field
Tender value
£81,663
tender field
Procurement method
Call-off from a framework agreement
Category
services
CPV
90700000
Environmental services
Delivery
Not stated
SW1P 3JR
PUBLISHED DESCRIPTION

What the notice says

The Environment Agency is seeking to appoint a Contractor to undertake flood risk modelling and outline designs relating to Westbrook Mill weir on the River Wey (SU9666944205) and its proposed removal. Site Background Westbrook mill has been present for approximately 300 years, and numerous weirs and control structures have been in place maintaining a head of water for its operation. The mill and associated factory have been closed for decades and there is negligible heritage value associated with the site. The weir at Westbrook Mill consists of six 1.5m wide sluice gates in steel frames. There is a difference of 1.3m between the upstream and downstream bed levels, and a maintained upstream water level 1.6m above the weir sill of 36.3m AOD. The side walls downstream of the weir are cast concrete and there is a cast concrete central pier which extends 15m downstream under the road bridge giving access to the complex car park. An access walkway is present over the weir, and the weir is manually operated. The cast concrete 'troughs' formed by the walls and the central island also have a cast concrete bed slab set at approximately 36.2m AOD which functions as a second, shallow weir at low water level conditions. Upstream of the weir the channel is confined between steel sheet pile walls with concrete capping beams for approximately 50m. There are three overspill weirs upstream that feed the Hell Ditch (SU9582944564, SU9630344350, SU9655644244), which rejoins the main river approximately 3km downstream. There is also an informal breach which introduces additional flow into the Hell Ditch (roughly SU9649544320). In 2016, the Environment Agency installed a brush-furnished fish pass at the most-upstream overspill weir, allowing the Hell Ditch to function as a fish migration route bypassing Catteshall and Westbrook weirs on the main River Wey.

Tender statuscomplete
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release6 Oct 2025
  2. 02Tender period endsTender-period field as published12 Sept 2025
  3. 03Contract startsContract-period field as published5 Oct 2025
  4. 04Contract endsContract-period field as published30 Mar 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

Published name only

WSP UK Limited

No legal entity is inferred from this supplier name.