PERMANENT AWARD EVIDENCE

Muck Away Haulage

BALFOUR BEATTY CIVIL ENGINEERING LIMITED · published 9 Sept 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID38c6ea32-8ac2-45f8-b825-931e60ea44cc-862715
Open Contracting ID (OCID)ocds-b5fd17-db3cc59c-2ec5-407c-a3c3-16767d6c4911
Buyer identifierGB-SRS-supplierregistration.cabinetoffice.gov.uk/UfZq8heB
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£300,000
tender field
Procurement method
Competitive quotation (below threshold)
Category
services
CPV
45000000
Construction work
Delivery
South East, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North. Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety. The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions. The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and around the junction for both pedestrians and cyclists. Other construction works include but not limited to the following: -2no. underpasses for the M3 mainline and A34 Northbound -1no. pedestrian subway -9no. MS4s, 1no. long span and 1no. portal gantries -Footbridge over the River Itchen -6no. locations for sheet piling locations and 1no. for blockwork retaining wall -Site wide motorway communications installation -Site wide vehicle restraint barrier installation The scope of the works required is for the removal of arisings from the site including concrete, asphalt and inert materials.

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release9 Sept 2025
  2. 02Tender period endsTender-period field as published19 Sept 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 9 Sept 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗