PUBLISHED COMMERCIAL FIELDSValues stay separate.
A tender estimate and an award value answer different questions. Neither is treated as cash paid.
- Award value
- £249,594
award field- Tender value
- £250,000
tender field- Procurement method
- Call-off from a framework agreement
- Category
- works
- CPV
- 45000000
Construction work- Delivery
- Not stated
WN5 0UU
PUBLISHED DESCRIPTION
What the notice says
Awarded contract via direct award under NHS Hard Facilities Management 2 Framework (SBS10166) Lot 3.3 Low Carbon Energy Infrastructure.
The carbon work at Wigan Community Fire and Ambulance Station involves the replacement of the existing gas-fired domestic hot water system with a packaged electric Air Source Heat Pump (ASHP) solution, including all ancillary equipment, housed within an external compound. Plus, the connection of the new ASHPs to the building management system (BMS) to provide control, monitoring (including energy consumption data), and analytics.
• The scheme at Wigan is expected to reduce the annual carbon emissions by circa 12.5 tonnes.
• The works are to be coordinated in a manner that minimises disruption to daily fire station operations and activities.
• The contractor will take responsibility for the design from RIBA Stage 4b and construction RIBA Stage 5.
• The formal construction programme will be issued once the formal contractor award is made.
• It is proposed that the contract will be awarded on a JCT Minor Works with Contractor's Design 2024 form of contract.
Tender statuscomplete