WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives

Costain Limited (H7-Heathrow) · published 2 Jun 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID30b4b20a-4bc7-4af3-a070-34305c20e5bb-900111
Open Contracting ID (OCID)ocds-b5fd17-25f831be-e278-45de-ba56-42465ff8de0f
Buyer identifierGB-CFS-271218
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£5,000,000
tender field
Procurement method
Not stated
Category
services
CPV
71320000
Engineering design services
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

Expression of Interest Tunnel Vent, Fans and Fan Drives MEP Subcontractor Tunnel Vent, Fans and Fan Drives (Survey and RIBA 4) Scope The objective of this scope is to replace components that form part of the ventilation system at Central Terminal Area (CTA) North and South, Terminal 4 North and South and Sipson Farm, that are at their end of life. The components of concern are Fan Drives and Low Voltage Air Circuit Breakers. It is proposed that all components for the 8 No. existing Variable Speed Drives (VSD) which are close to their designed lifetime are to be replaced, together with the panel. It is proposed that all components for the 5 No. existing Direct On-Line (DOL) starters which are close to their designed lifetime are to be replaced, together with the panel are replaced with VSD's. The VSDs are to be connected to the Tunnel Control System (TCS). The incoming air circuit breakers (ACB's) and the low voltage protection devices (MCCB/MCB's) within the existing switch gear will be replaced with new devices. Where the impact is significant, this may lead to replacing the entire LV switchgear and the DOL panels for the associated equipment. New lighting will be provided by energy-efficient LED luminaires, as the existing lighting system is in poor condition. As part of small power provision, 240V socket outlet assemblies shall be provided near damper units. The existing junction boxes and cable termination boxes need to be replaced with new equipment. Item Question Q1 What capability do you have of understanding the requirements for replacing Electrical infrastructure etc., Specifically considering the constraints of an operational rail network? Q2 What capability do you have of carrying out a survey of the 5 ventilation buildings non-operational hours to provide all the information required to complete the RIBA 4 design? Note: - RIBA 5 onwards including construction is excluded.

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release2 Jun 2026
  2. 02Tender period endsTender-period field as published9 Jun 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 2 Jun 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗