PERMANENT AWARD EVIDENCE

Manchester International Airport - Temporary Works Piling Enabling Works

Kier Transportation - CP7 NWC · published 10 Feb 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID22a58595-1e7e-45f7-8219-c50361b9fec8-882936
Open Contracting ID (OCID)ocds-b5fd17-884001d1-7f09-454f-9e07-e5113c336614
Buyer identifierGB-CFS-294297
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£500,000
tender field
Procurement method
Not stated
Category
works
CPV
44212400
Piling
Delivery
North West, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The piling mat location along S2 and S1 walls will need to be installed to accommodate the arrival of the SF95 CFA piling rigs. The excavation of material and installation of temporary works for the pile mats will be on 3rd party land belonging to the Clayton Hotel and MAG. - Clayton Hotel Wall Removal/Relocation and Reinstatement upon completion. - Remove Fencing - Piling Mat Installation (S1 134m, S2 194m) - Screw Piles - Stone up the area adjacent to the UU area (already deveged) - Install Railway access steps

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release10 Feb 2026
  2. 02Tender period endsTender-period field as published20 Feb 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 10 Feb 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗