PERMANENT AWARD EVIDENCE

EKFB JV - Highways Works NC2A

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 · published 29 May 2026. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID1d61fc20-e220-40a0-b5ce-d9c847425012-899597
Open Contracting ID (OCID)ocds-b5fd17-9ba1c494-c868-4466-b328-bd78f216e66e
Buyer identifierGB-CFS-179525
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£500,000
tender field
Procurement method
Not stated
Category
works
CPV
45233130
Construction work for highways
Delivery
South East, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document. The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded. The works included as part of this scope to be delivered by the subcontractor are: - Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location. - Earthworks including excavation to formation, soft spot treatment if required. - Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems. - Service ducts: including supply and installation of service ducts, connections and chambers. - Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layers Please express your interest within this package.

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release29 May 2026
  2. 02Tender period endsTender-period field as published5 Jun 2026
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 29 May 2026 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗