PERMANENT AWARD EVIDENCE

Screeding C4-KCSL

Kilnbridge Construction Services Ltd · published 13 Feb 2025. This page preserves the identifiers and current held fields for one Contracts Finder release; it is not an invoice, performance assessment or complete contract history.

Contracts Finder release ID025e9aaf-0c2a-4648-9875-f8223430b8b9-825909
Open Contracting ID (OCID)ocds-b5fd17-f96d7e6e-e4e4-4bd7-a6c4-b012c08bfc6a
Buyer identifierGB-CFS-288768
Release typetender
PUBLISHED COMMERCIAL FIELDS

Values stay separate.

A tender estimate and an award value answer different questions. Neither is treated as cash paid.

Award value
Not disclosed
award field
Tender value
£1,000,000
tender field
Procurement method
Not stated
Category
services
CPV
45262320
Screed works
Delivery
London, United Kingdom
No postcode
PUBLISHED DESCRIPTION

What the notice says

The Subsubcontract works is the provision of all necessary People, Equipment, Plant, Materials, methodology, design and detailing for The Screeding works as described in this document, scope drawings and specification. Including all required temporary works, and their design, installation of, ongoing maintenance of and removal required for the safe execution of the Subsubcontract works. The Subsubcontract works shall be undertaken in accordance with the various documents referenced within this document including Appendix 2, Document Register. The scope of each ancillary building is from Platform level to the highest point, internal roof level of each building. Subsubcontractor Design Scope: The Subsubcontractor shall be responsible for developing the Contractors Detailed Design to Design for Construction & Installation. The Subsubcontractor shall be responsible for providing their own construction drawings, compliant with the design intent of the Contractors design. For further details, please see Design for Construction and Manufacturing (Contractor Design) Management Plan for Contract 1CP02-BVS-DS-PLN-SS07- 000020. The Subsubcontractor shall be responsible for the co-ordination and integration of their design with Others provided by the Contractor and the Contractor's design consultant, Specialist Designers / Engineers, Consultants or Specialist Subcontract Designers, and shall co-operate and consult with these other designers to the extent necessary for the proper and timely performance of their own and Others' works. The Subsubcontractor will allow for interfaces with other trades including but not limited to: • Mechanical & Electrical permanent works • Door installations • Drainage/ Public Health • Fire stopping • Floor Hatches • Floor finishes • Grated flooring • Other work packages

Tender statusactive
STAGE-DATE LEDGER

Reported dates, without an invented lifecycle.

The current projection contains one award release, not a verified chain of planning, tender, award, contract and modification records. Dates are shown in source-field order and are not silently repaired.

  1. 01Notice publishedPublication timestamp on the held release13 Feb 2025
  2. 02Tender period endsTender-period field as published19 Feb 2025
SUPPLIER EVIDENCE

Published names and exact identifiers

A company profile appears only when this release carries a usable company number. Name-only suppliers remain name-only.

No supplier is named in this projection. That does not prove the notice had no supplier in every source version.

SOURCE

Contracts Finder release

Published 13 Feb 2025 · held through the daily award projection · Open Government Licence v3.0.

Inspect the official JSON release ↗