PUBLISHED COMMERCIAL FIELDSValues stay separate.
A tender estimate and an award value answer different questions. Neither is treated as cash paid.
- Award value
- Not disclosed
award field- Tender value
- Not disclosed
tender field- Procurement method
- Not stated
- Category
- Not stated
- CPV
- 45000000
Construction work- Delivery
- South East, United Kingdom
No postcode
PUBLISHED DESCRIPTION
What the notice says
Project brief/summary: - Draught proofing external doors - Loft insulation under main auditorium roof. - Denton Lounge (Atrium) And Kiosk Loft void insulation (excluding the flat roof areas) - Secondary Glazing - dressing rooms, lobby, kitchen, excluding main auditorium & Denton Lounge (Atrium). - Secondary Glazing - main auditorium & Denton Lounge (Atrium). - Some localised fire stopping to new and/ or existing disturbed services penetrations may be required. - Strip out of heating plantroom and new plant installation to allow for future connection of District Heating System. - Temporary containerised boiler plant & associated temporary services - Variable speed pump installation. - Heating zone control valves. - Zone energy metering - Domestic Hot Water Service cylinder to be replaced with a plate heat exchanger, buffer vessel & ancillaries to suit the district heating energy source. - Zone energy metering. - New BMS system - New heating circuit and heater batteries to roof mounted auditorium AHU's - Insulation of existing LTHW pipework. - Replacement radiators. - Replace all TRV's with Dynamic radiator control valves (D-TRV's) on heating system. - Cold Store door replacement - New smart switches. - New supplies to BMS and plantroom services - New lighting to plantroom - Fire Alarm modification to plantroom - Removal of electrical services to AHU heater batteries In order to be considered for this opportunity please express an interest by emailing procurement@adur-worthing.gov.uk. Your expression of interest should include the details of your business and at least 2 example of where you have carried out similar works; include client details, scope of works value and outcome. The councils reserve the right to open the opportunity prior to the end of this early engagement notice as the opportunity has short turnaround times.
Tender statusplanning